Post by rob52 on May 3, 2014 1:47:54 GMT -5
"You can only let the smoke out once "or "One Flash & your Ash"
=>> The aim of the thread is to raise awareness so it never happens again!
A "Thread" for links & photos of electrical failure reports, presentations & pictures or "Failure of Procedures" leading to an Electrical Shock/Burns Incident.
2006 WMEA Variety of Failure Investigations Presentation
Suggestions for Conducting Electric Shock Investigations
***********
Like these...
13 May 1997 - 12.7kV Overhead Conductor proximity encroachment - Fatality
31 October 1995 - 13.8kV Direct Contact - Fatality & Burns
1 July 1999 - 4160V Direct Contact - Fatality
1 July 1999 - 4160V Direct Contact - Fatality - FAB
1999 - Applies to both 415V & 1000V moulded case circuit breakers, internal metal was exposed through the broken toggle which is electrically connected to one phase of the load side of the breaker - Electric Shock
1999 - Inadequate CB Isolating Device Rating
2000 - 110V Lighting Cct - Electric Shock
2000 - 240V Fixed Wiring - Electric Shock
21 June 2001 - 12.47kV Contact - Electric Shock & Burns
2001 -RCBO Failure to operate - Fire
2001 - 240V Hand Tool - Electric Shock
2004 - 415V AC Direct Contact - Electric Shock
2005 - 460V DC Direct Contact - Electric Shock
20 June 2005 - 11kV access to live equipment - Electric Shock & Burns
2005 - 11kV access to live equipment - Electric Shock & Burns
2006 - 1000V Restrained Recptacles -Failure of Earthing Connections - Electric Shock
2006 - 1000V Restrained Recptacles -Failure of Earthing Connections - Electric Shock & Arcing
5 June 2006 - 11kV Arc Flash & Explosion
27 June 2006 - Fuse Failure
5 September 2006 - 11kV Oil Filled CB Failure
4 April 2007 - 3.3kV Cable damage longwall midface Failure to restrain and mechanically protect trailing cables - Arc flash in Hazardous Zone
15 November 2007 - 3.3kV access to live equipment - Electric Shock & Burns
2007 - 3.3kV access to live equipment - electric shock & burns
28 March 2008 - 3.3kV Restrained Receptacle Failure - Arc Flash & Plug Failure
June 2008 - 3.3kV 750kW motor starting event resulted in equipment failure and arc flash incident
7 July 2008 - 4160V Direct Contact - Electrical Fatality
7 July 2008 - 4160V Direct Contact - Electrical Fatality - FAB
17 April 2009 - 415V AC - Arc Flash & Burns
21 October 2009 - 22kV RMU Live Internal Access - High Energy Arc Flash
2009 1kV Access to live equipment + Multimeter erroneously energised at 1kV AC failed catastrophically -Arc Flash and Burns
10 October 2010 - 480V Work on Energised Equipment - Fatality, Arc Flash & Burns
2010 - 240V DI Hand Tool
2011 - 415V Cubicle Arc Flash & Burns
18 January 2011 - Welding Electric Shocks
2011 Welding can easily Electrocute You
10 June 2012 - Failure to ensure appropriately screened cables for VSD applications - Electric Shock
15 April 2014 - 380V Fault in 75kW Motor Control Panel
Rob
=>> The aim of the thread is to raise awareness so it never happens again!
A "Thread" for links & photos of electrical failure reports, presentations & pictures or "Failure of Procedures" leading to an Electrical Shock/Burns Incident.
2006 WMEA Variety of Failure Investigations Presentation
Suggestions for Conducting Electric Shock Investigations
***********
Like these...
13 May 1997 - 12.7kV Overhead Conductor proximity encroachment - Fatality
31 October 1995 - 13.8kV Direct Contact - Fatality & Burns
1 July 1999 - 4160V Direct Contact - Fatality
1 July 1999 - 4160V Direct Contact - Fatality - FAB
1999 - Applies to both 415V & 1000V moulded case circuit breakers, internal metal was exposed through the broken toggle which is electrically connected to one phase of the load side of the breaker - Electric Shock
1999 - Inadequate CB Isolating Device Rating
2000 - 110V Lighting Cct - Electric Shock
2000 - 240V Fixed Wiring - Electric Shock
21 June 2001 - 12.47kV Contact - Electric Shock & Burns
2001 -RCBO Failure to operate - Fire
2001 - 240V Hand Tool - Electric Shock
2004 - 415V AC Direct Contact - Electric Shock
2005 - 460V DC Direct Contact - Electric Shock
20 June 2005 - 11kV access to live equipment - Electric Shock & Burns
2005 - 11kV access to live equipment - Electric Shock & Burns
2006 - 1000V Restrained Recptacles -Failure of Earthing Connections - Electric Shock
2006 - 1000V Restrained Recptacles -Failure of Earthing Connections - Electric Shock & Arcing
5 June 2006 - 11kV Arc Flash & Explosion
27 June 2006 - Fuse Failure
5 September 2006 - 11kV Oil Filled CB Failure
4 April 2007 - 3.3kV Cable damage longwall midface Failure to restrain and mechanically protect trailing cables - Arc flash in Hazardous Zone
15 November 2007 - 3.3kV access to live equipment - Electric Shock & Burns
2007 - 3.3kV access to live equipment - electric shock & burns
28 March 2008 - 3.3kV Restrained Receptacle Failure - Arc Flash & Plug Failure
June 2008 - 3.3kV 750kW motor starting event resulted in equipment failure and arc flash incident
7 July 2008 - 4160V Direct Contact - Electrical Fatality
7 July 2008 - 4160V Direct Contact - Electrical Fatality - FAB
17 April 2009 - 415V AC - Arc Flash & Burns
21 October 2009 - 22kV RMU Live Internal Access - High Energy Arc Flash
2009 1kV Access to live equipment + Multimeter erroneously energised at 1kV AC failed catastrophically -Arc Flash and Burns
10 October 2010 - 480V Work on Energised Equipment - Fatality, Arc Flash & Burns
2010 - 240V DI Hand Tool
2011 - 415V Cubicle Arc Flash & Burns
18 January 2011 - Welding Electric Shocks
2011 Welding can easily Electrocute You
10 June 2012 - Failure to ensure appropriately screened cables for VSD applications - Electric Shock
15 April 2014 - 380V Fault in 75kW Motor Control Panel
Rob